Ardrath Block A&B Apartments Development
The project consisted of the design and build construction of 2 nr apartment blocks (Block A&B). Block A comprised of the construction of a 4-story apartment block consisting of 32 no. one-bedroom apartments and 54 no. two bedroom apartments (total 86 no.) with two stair cores and two lift shafts. Block B comprised of the construction of a 2-story apartment block consisting of 16 no. apartments in a mix of one bedroom and two-bedroom apartments
The Main Works comprise of the following:
• Enabling works, involving the establishment of project offices/compound
• Ground Works (Drainage, Sewerage
• Piled Foundation Works
• Construction of 4 story concrete frame apartment block
• Construction of internal circulation including shared stairways and lifts
• Full M&E Services Installation
• New switch/plant room,
• New roof mounted solar panels;
• New communal bin stores;
• New pedestrian/vehicular access
• New car park & bicycle spaces
• New hard and soft landscaping
• New boundary walls
• New connection to existing site services
• All ancillary site development works above and below ground
Detail
Client:
Ardstone Homes
Location:
Crodaun, Celbridge, Kildare
Value:
€23,000,000
Duration:
18 Months
Architect:
John Fleming Architects
Project Manager:
KSN
QS:
Scollard Doyle
M&E Engineer:
Fallon Design
Civil & Structural:
DBFL Consulting Engineers